Port of Liverpool redevelopment has made good progress with the dredging and reclamation of material from the docks.

Our company continues to assist with the Thames Tideway Project at Beckton on the River Thames.

WM Plant Hire helped BAM complete works ahead of schedule at Gatwick with their 2 CAT 330 long reach excavators.

Our long reach CAT349E assists in the installation of piles on river with limited access for standard reach machines.

WM Plant Hire assist McLaughlin & Harvey in major expansion of the harbour at Invergordon, Scotland.

WM Plant Hire continue work on prestigious Queensferry Crossing project, Scotland.

WM Plant Hire provide a safe and effective solution to stabilise rail embankment without disruption to the rail line.

WM Plant Hire work with Environment Agency on a weed cutting programme, Somerset.

WM Plant Hire involved in major rail embankment scheme in Wiltshire on the main east to west line to London.

WM Plant Hire continue their involvement with the installation of one of the longest outfall pipelines in the UK, at Bridlington on the Yorkshire coast.

WM Plant Hire involved in massive development in Canary Wharf that will maximise the space available in the heart of London by reclaiming water filled docks. 

WM Plant Hire involved in significant milestone for Crossrail project.

WM Plant Hire assist in emergency works after landslip on crucial East Sussex rail line.

WM Plant Hire involved in challenging underwater engineering at Milford Haven dock refurbishment.

Clearing 500 tonnes of debris from the River Severn at Worcester after the winter floods.

Scour protection works to Kirkstall Bridge under challenging conditions were successfully completed ahead of schedule.

The 60 tonne long reach equipped with GPS dig system, rockwheel and underwater breaker attachments in Jersey.

Page 3 of 9

News Archive

  • February 2018 >

    Maintaining Reservoir Resilience Read More
  • January 2018 >

    Network Rail Gold Site Read More
  • December 2017 >

    Back on Tideway at Albert Embankment Read More
  • November 2017 >

    Enabling Works for Beatrice Offshore Windfarm Read More
  • October 2017 >

    WM return to V&A Museum Dundee Read More
  • September 2017 >

    Back at Severn Valley Railway Read More
  • August 2017 >

    New unique low ground pressure long reach! Read More
  • July 2017 >

    Reaching out...to private clients Read More
  • June 2017 >

    Working locally on specialist excavation Read More
  • May 2017 >

    Reflecting on 33 years of the Thames Barrier Read More
  • April 2017 >

    Exeter highway improvements use longest reach excavator in the UK Read More
  • March 2017 >

    Watercourse maintenance with ATM one of UK's leading landscaping, highway maintenance contractors using log grab Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

Latest News