The 60 tonne long reach equipped with GPS dig system, rockwheel and underwater breaker attachments was mobilised to St. Helier in Jersey to assist with the installation of a new linkspan. A rocky outcrop of granite had to be removed and the ferry berth dredged with the port remaining in operation as usual.