Tel +44 (0)1746 769555

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

January 2012

The London 2012 Cable Car across the River Thames from Greenwich to Victoria Dock was supported on a pier sited in the river. Mounted on Red 7’s ‘Haven Seavoyager’, the 24m long reach excavator was used to excavate the foundation and place scour protection around the tubular piles. Situated directly south of the Olympic Park, the Cable Car will connect the main Olympic site with the O2 Arena.

News Archive

  • December 2019 >

    Keeping wetland project on track with LGP Read More
  • November 2019 >

    Specialist deep excavation at Davro Steel Read More
  • October 2019 >

    Heavyweight long reach works on milestone development Stornoway Read More
  • September 2019 >

    Somerset Pioneer Dredge for NEW CASE CX370 22m Read More
  • August 2019 >

    Upgrading Coastal Defences Read More
  • July 2019 >

    Revetment works on River Irwell Read More
  • June 2019 >

    Emergency Call Outs Nationwide Read More
  • May 2019 >

    North Portsea Flood Defence Read More
  • April 2019 >

    Innovation at Runcorn Docks Read More
  • March 2019 >

    Unearthing WWII fighter with specialist LGP Read More
  • February 2019 >

    Return to Thames Tideway Read More
  • January 2019 >

    The CAT385 Rocks at Brixham Breakwater Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14

Latest News

Newsletter

Download current Newsletter

Sign up to our regular newsletter and keep up to date with our latest projects and news:

Subscribe