Tel +44 (0)1746 769555

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

January 2012

The London 2012 Cable Car across the River Thames from Greenwich to Victoria Dock was supported on a pier sited in the river. Mounted on Red 7’s ‘Haven Seavoyager’, the 24m long reach excavator was used to excavate the foundation and place scour protection around the tubular piles. Situated directly south of the Olympic Park, the Cable Car will connect the main Olympic site with the O2 Arena.

News Archive

  • November 2021 >

    Spider in the Valleys Read More
  • October 2021 >

    Zero-Tail on Scour Project Read More
  • September 2021 >

    Heavy Lifting on Ferry Terminal Read More
  • August 2021 >

    Supporting Bearsted Blockade Read More
  • July 2021 >

    Working on Water with EA Contractors Read More
  • June 2021 >

    Zero Tail ideal of Constraints M6 Highway Site Read More
  • May 2021 >

    Specialist Reclamation at Liverpool Dock Read More
  • April 2021 >

    Digging Deep at Walsall Wood STW Read More
  • March 2021 >

    Efficiency and Control with CASE CX370  Read More
  • February 2021 >

    Rapid response to Rail Emergency Read More
  • January 2021 >

    Deep dredging at Canada Dock, Liverpool Read More
  • December 2020 >

    Dyke Maintenance with 'Spider' Excavator Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

Latest News

Newsletter

Download current Newsletter

Sign up to our regular newsletter and keep up to date with our latest projects and news:

Subscribe