As part of infrastructure improvements on a project in Bolton, the embankment between two reservoirs on different levels had to be strengthened. Working with JN Bentley the works involved the removal of topsoil, re-profiling and the placement of drainage matting along the toe of the slope. WM Plant Hire used their CAT machine with 25 metre reach which was fitted with a tilting bucket.