We were proud to be back at Severn Valley Railway again this month assisting with repairs following a landslip on the historical track. The company has been involved in multiple emergency repairs on the track over the past 5 years due to damage caused by flood conditions. This time our powerful Doosan 300 long reach machine was used to assist with the drilling of soil anchors in stabilisation works on a site with tight access.

NCE Bridge Supplier 2026 Finalist
Heavy lifting at Milford-on-Sea with Hitachi 1200
Power and Productivity at Kishorn Port
Complex Platform Demolition Delivered at Berrylands Station
Birdlip - Highway Access Challenge Conquered
Birnbeck Pier: Trusted with Precision Restoration
WM Plant Hire Returns to Sheerness for Precision Dredging at Berth 5
Spider Excavator Successfully Completes Llangollen Canal Recovery Operation
Nailing it with the Spider to Overcome Tricky Access
Overcoming Challenging Ground Conditions at Havant Thicket Reservoir
Spider Tackles Motorway Clearance Operations
Dynamic Duo Combine Forces for Flood Protection