This month WM Plant Hire have been working with JN Bentley at Warland Reservoir in Lancashire. Essential improvement works used their 15-tonne machine with 13m long reach for the excavation and backfill on the siphon installation. This siphon system was being installed for emergency draw down of water. A specially fitted compaction plate attachment proved a much safer method for working on the slope of the reservoir dam.

NCE Bridge Supplier 2026 Finalist
Heavy lifting at Milford-on-Sea with Hitachi 1200
Power and Productivity at Kishorn Port
Complex Platform Demolition Delivered at Berrylands Station
Birdlip - Highway Access Challenge Conquered
Birnbeck Pier: Trusted with Precision Restoration
WM Plant Hire Returns to Sheerness for Precision Dredging at Berth 5
Spider Excavator Successfully Completes Llangollen Canal Recovery Operation
Nailing it with the Spider to Overcome Tricky Access
Overcoming Challenging Ground Conditions at Havant Thicket Reservoir
Spider Tackles Motorway Clearance Operations
Dynamic Duo Combine Forces for Flood Protection