This month WM Plant Hire have been working with JN Bentley at Warland Reservoir in Lancashire. Essential improvement works used their 15-tonne machine with 13m long reach for the excavation and backfill on the siphon installation. This siphon system was being installed for emergency draw down of water. A specially fitted compaction plate attachment proved a much safer method for working on the slope of the reservoir dam.