Between junctions 10 to 13 of the M1 motorway the widening project is well underway. The seven tonne and 23 tonne long reach excavators from WM Plant Hire being used to profile the new embankments and place topsoil on the slopes. The restricted access makes the use of long reach machines an effective solution in the movement of material and loading of wagons.