Phase 2 works at Acton Turville on the South Wales Branch Line involved two 60 tonne long reach machines fitted with rockwheel and drill mast attachments. The rail slope stabilisation scheme involved reprofiling of the rock slope and the installation of rock mesh together with an anchoring system.