As part of the environmental improvements at Cavendish Dock, a new footway and cycle path is to be constructed around the dock basin. The 60 tonne long reach machine is being used to place rock armour and stone infill across a part of the dock for the new access road to be built. A heavy duty rock grapple is being used to place rocks over 3 tonnes in weight at a radius of 20 metres.