Working with their NEW Euromach R555 Spider straddling the drainage ditch in the awkward access location beside the main North Devon link road the Spider was involved with important clearance works this month working with highways contractors. Following the last period of heavy rains the highway ditch had become blocked with silt washed into the channel, needing crucial clearance to mitigate future flood risk.

NCE Bridge Supplier 2026 Finalist
Heavy lifting at Milford-on-Sea with Hitachi 1200
Power and Productivity at Kishorn Port
Complex Platform Demolition Delivered at Berrylands Station
Birdlip - Highway Access Challenge Conquered
Birnbeck Pier: Trusted with Precision Restoration
WM Plant Hire Returns to Sheerness for Precision Dredging at Berth 5
Spider Excavator Successfully Completes Llangollen Canal Recovery Operation
Nailing it with the Spider to Overcome Tricky Access
Overcoming Challenging Ground Conditions at Havant Thicket Reservoir
Spider Tackles Motorway Clearance Operations
Dynamic Duo Combine Forces for Flood Protection