Working alongside Environment Agency Contractors, WM Plant Hire's CASE 245 zero tail long reach excavator played a crucial role in the £2.5 billion Kempsey Pumping Station infrastructure upgrade project this month. With a 15.5m outreach, the machine overcame tight access constraints, enabling the construction of a platform to safely clear debris from the screen; as well as facilitating cofferdam excavation to the required depth. This work was instrumental in mitigating future flooding risks to 150 properties in Kempsey; and the project's success highlights both the versatility and value of the zero tail long reach excavator as a solution for complex infrastructure projects.

NCE Bridge Supplier 2026 Finalist
Heavy lifting at Milford-on-Sea with Hitachi 1200
Power and Productivity at Kishorn Port
Complex Platform Demolition Delivered at Berrylands Station
Birdlip - Highway Access Challenge Conquered
Birnbeck Pier: Trusted with Precision Restoration
WM Plant Hire Returns to Sheerness for Precision Dredging at Berth 5
Spider Excavator Successfully Completes Llangollen Canal Recovery Operation
Nailing it with the Spider to Overcome Tricky Access
Overcoming Challenging Ground Conditions at Havant Thicket Reservoir
Spider Tackles Motorway Clearance Operations
Dynamic Duo Combine Forces for Flood Protection