We recently supported the Southern Renewals Enterprise (SRE), where BAM and VolkerStevin teams worked together at Lingfield using our CAT 30m long reach excavator to enable successful soil nailing operations despite limitations presented by the nearby River Eden. The mobilisation and demobilisation process was a complex affair, involving navigation of narrow roads, bridges, and weight limitations. Our fitting team ensured continuous work on site while our operations team enabled smooth deployment, both earning praise from BAM for their "great support" throughout. VolkerStevin’s agent commended our operators on their productivity and effective collaboration with their site teams; which were able to work safely and efficiently with the 30m long reach, sitting back from the embankment to overcome the site's challenging conditions. We're delighted to have contributed to the project's success and look forward to continuing our support of SRE's challenging projects.

NCE Bridge Supplier 2026 Finalist
Heavy lifting at Milford-on-Sea with Hitachi 1200
Power and Productivity at Kishorn Port
Complex Platform Demolition Delivered at Berrylands Station
Birdlip - Highway Access Challenge Conquered
Birnbeck Pier: Trusted with Precision Restoration
WM Plant Hire Returns to Sheerness for Precision Dredging at Berth 5
Spider Excavator Successfully Completes Llangollen Canal Recovery Operation
Nailing it with the Spider to Overcome Tricky Access
Overcoming Challenging Ground Conditions at Havant Thicket Reservoir
Spider Tackles Motorway Clearance Operations
Dynamic Duo Combine Forces for Flood Protection