The recent flooding events near Doncaster have caused undermining of the main rail line, adjacent to the problems experienced by the Ulley Dam in retaining the high water level in the reservoir. WM Plant are providing two long reach excavators to assist in the emergency slope stabilisation works to restore the transport infrastructure back to normal.