Working on a Network Rail project in north London, the rail embankment is being stabilised using soil nails. Access was the main constraint on this project, with WM Plant working closely with the Client to modify the machine to suit the access arrangements. Matting was placed on the slope after nailing and topsoil graded to the new profile using the long reach.