Tel +44 (0)1746 769555

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6

Displaying items by tag: underwater

As part of an upgrade at a sewage treatment works in Walsall Wood a long reach was required for some underwater deep excavation works in a shaft requiring a breaker.

The removal of underwater obstructions was a critical operation to ensure that the piling works were not delayed at Liverpool2 port development.

Published in News

V&A Museum reached major milestone with the recent completion of the cofferdam structure.

Published in News

Key milestone reached at St Mary's Harbour, Isles of Scilly with WM Plant Hire's help.

Published in News

WM Plant Hire involved in challenging underwater engineering at Milford Haven dock refurbishment.

Published in News

The 60 tonne long reach equipped with GPS dig system, rockwheel and underwater breaker attachments in Jersey.

Published in News

Extensive dredging and the removal of redundant steel and concrete piles at Torry Quay, Aberdeen

Published in News

24m long reach excavator used to excavate the foundation and place scour protection for Olympic Cable Car

Published in News

The 115 tonne CAT excavator with 30m reach was mobilised to the Port of Southampton for essential maintenance dredging work. Fitted with an underwater GPS dig system the machine was able to ‘spot dredge’ the areas that would pose a problem for ships to berth safely.

Published in News

Works are progressing well on the underwater excavation works on the new Forth Road Bridge in Scotland.

Published in News

News Archive

  • March 2022 >

    Spider Maintains Highways Balancing Pond Read More
  • February 2022 >

    Emergency Response for Spider Read More
  • January 2022 >

    Swing Bridge Canal Clearance Read More
  • December 2021 >

    Reaching out in Rail  Read More
  • November 2021 >

    Spider in the Valleys Read More
  • October 2021 >

    Zero-Tail on Scour Project Read More
  • September 2021 >

    Heavy Lifting on Ferry Terminal Read More
  • August 2021 >

    Supporting Bearsted Blockade Read More
  • July 2021 >

    Working on Water with EA Contractors Read More
  • June 2021 >

    Zero Tail ideal of Constraints M6 Highway Site Read More
  • May 2021 >

    Specialist Reclamation at Liverpool Dock Read More
  • April 2021 >

    Digging Deep at Walsall Wood STW Read More
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

Latest News

Newsletter

Download current Newsletter

Sign up to our regular newsletter and keep up to date with our latest projects and news:

Subscribe